AMF-125
AMF Panel, 125 kVA
A 125 kVA AMF panel automatically starts the generating set on mains failure and transfers the load. At 415 V three-phase a 125 kVA set draws approximately 174 A at full load, so the changeover device and breakers are rated at 200 A or above with a margin for the prospective fault level.
Fitment
Confirm the frame and winding number against the nameplate before ordering.
| Make | Model / frame | Notes |
|---|---|---|
| Universal | 125 kVA sets, 415 V 50 Hz | Confirm site fault level |
| Universal | 125 kVA sets, 480 V 60 Hz | Alternative build |
Specifications
| Set rating | 125 kVA / 100 kW |
|---|---|
| Full load current | ≈174 A at 415 V, 3-phase |
| Changeover | 200 A, 4-pole, motorised |
| Controller | DSE6020 or DSE7320 |
| Enclosure | IP54 floor-standing, powder coated |
| Metering | Multifunction meter, V / A / Hz / kW / pf |
| Protection | Over/under voltage, overload, short circuit, earth fault |
Cross-references
Equivalent and superseding numbers. Verify against the machine before substituting.
- AMF-62.5
- AMF-250
- AMF-500
Symptoms that lead here
- Manual changeover being operated on every outage
- Existing panel lacks set protection
- Retrofit of automatic start to a manual set
Questions about this part
What information do you need to quote an AMF panel?
Set rating in kVA, system voltage and frequency, number of phases, whether the neutral must be switched, the prospective fault level at the point of installation, preferred controller, and cable entry direction. Site altitude and ambient temperature matter where either is extreme.
How long does a panel build take?
A standard build is typically three to four weeks from confirmed specification, longer where a specific controller or breaker brand is required and not held in stock.